 +_____________________________________________________________________
 ] AUTHOR:            ]                             ] DR:              ]
 ] S. DEAN            ]    PASS PROGRAM NOTE        ]     41008        ]
 ]____________________]                             ]__________________]
 ] ORG/PHONE:         ] OPS NOTE ( )  USER NOTE (X) ] DATE:            ]
 ] ENG/282-7364       ]      RELEASE NOTE( )        ] AUG. 1987        ]
 ]____________________]_____________________________]__________________]
 ] OI/FLIGHT EFFECTIVITY:        ]  USER AFFECTED:                     ]
 ] REL 19 AND SUBS               ]  CREW (X)  GROUND (X)  DUMP ONLY ( )]
 ]_______________________________]_____________________________________]
 ]        MAJOR SOFTWARE AREA:       ] OPS MODES AFFECTED:             ]
 ]SSW ( )  GNC ( )  VU (X)  SM/PL ( )] G9                              ]
 ]_____________________________________________________________________]
 ] SOFTWARE SUB-AREA:  ECP, SPEC                                       ]
 ]_____________________________________________________________________]
 ] PRINCIPAL FUNCTIONS: V4.2                                           ]
 ]_____________________________________________________________________]
 ] TITLE:  GPC/BTU READINESS TEST OF THE MCIU                          ]
 ]_____________________________________________________________________]
 ] DESCRIPTION:                                                        ]
 ] PROBLEMS:                                                           ]
 ] A. IF LEVEL 1 TEST IS RUN BEFORE LEVEL 2 TEST, THE LEVEL 2 TEST     ]
 ]    WILL FAIL SINCE THE MCIU WOULD RETAIN THE "F0F0" PATTERN SET BY  ]
 ]    LEVEL 1 TEST.                                                    ]
 ] B. BTU READINESS TESTING WILL GENERATE AN "S" BIT ERROR ON THE      ]
 ]    FIRST TRANSACTION AFTER MCIU POWER ON, THEREFORE, FAILING THE    ]
 ]    TEST WITH A BTU I/O ERROR.                                       ]
 ]                                                                     ]
 ] ASSUMPTIONS:                                                        ]
 ] B(1) NO ARM SELECTED ON D & C PANEL.                                ]
 ] B(2) MCIU POWER IS PRIMARY.                                         ]
 ] A(1) WORD 45 IS SET TO ZERO (0000) UPON POWER ON INITIALIZATION.    ]
 ] A(2) VU CAN TERMINATE LEVEL 2 TESTING VIA ITEM 28 ON THE GPC/BTU    ]
 ]      I/F DISPLAY AND GENERATE A SECOND MCIU TRANSACTION VIA ENTRY   ]
 ]      OF A LEVEL 2 TEST ENABLE ITEM ENTRY.                           ]
 ]_____________________________________________________________________]
 ] USER RESPONSE:                                                      ]
 ] A1) ALWAYS RUN LEVEL 2 TEST PRIOR TO LEVEL 1 TEST.                  ]
 ] B2) INITIATION OF THE LEVEL 2 TRANSACTION FOR THE FIRST TIME WILL   ]
 ]     RESULT IN A DISPLAY OF TEST STATUS, STEP, RDW AND BCE STAT REG  ]
 ]     DATA, ALSO RMS MASTER ALARM AND GPC DATA LIGHTS.                ]
 ] A3) TERMINATE LEVEL 2 TEST VIA ITEM 28 AND THEN REINITIATE VIA      ]
 ]     LEVEL 2 TEST ENABLE ITEM ENTRY. TEST SHOULD NOW COMPLETE        ]
 ]     SATISFACTORILY.                                                 ]
 ] A4) INITIATE LEVEL 1 TEST.                                          ]
 ] A5) THE DISPLAY WILL DEPICT THE BIT SETTINGS AS A RESULT OF THE     ]
 ]     LEVEL 1 AND LEVEL 2 TESTING.                                    ]
 ]_____________________________________________________________________]
 ]CONCURRENCE:                           ]APPROVAL:                    ]
 ]IBM: WYATT COOPER         DATE 9/13/88 ]                             ]
 ]    --------------------      ---------]                             ]
 ]SSD: SAM ANKNEY           DATE 9/13/88 ]                             ]
 ]    --------------------      ---------] JACK G BOYKIN       9/20/88 ]
 ]PF MGR: ERIC BINGHAM      DATE 9/13/88 ]------------------- -------- ]
 ]       -----------------      ---------] CHAIRMAN, SASCB      DATE   ]
 ]_______________________________________]_____________________________]
 @
