 +_____________________________________________________________________
 ] AUTHOR:            ]                             ] DR:              ]
 ] J. SOLLINGER       ]    PASS PROGRAM NOTE        ]     36544        ]
 ]____________________]                             ]__________________]
 ] ORG/PHONE:         ] OPS NOTE ( )  USER NOTE (X) ] DATE: AUG. 1987  ]
 ] IBM/282-8461       ]      RELEASE NOTE( )        ] REV B: 08/20/90  ]
 ]____________________]_____________________________]__________________]
 ] OI/FLIGHT EFFECTIVITY:        ]  USER AFFECTED:                     ]
 ] REL 19 AND SUBS               ]  CREW (X)  GROUND ( )  DUMP ONLY ( )]
 ]_______________________________]_____________________________________]
 ]        MAJOR SOFTWARE AREA:       ] OPS MODES AFFECTED:             ]
 ]SSW (X)  GNC ( )  VU ( )  SM/PL ( )] 0, G2, G8, G9, S2, S4, PL9      ]
 ]_____________________________________________________________________]
 ] SOFTWARE SUB-AREA: DISP, RM                                         ]
 ]_____________________________________________________________________]
 ] PRINCIPAL FUNCTIONS: STIM                                           ]
 ]_____________________________________________________________________]
 ] TITLE:                                                              ]
 ] MTU DOWN ARROWS NOT REMOVED ON TIME MANAGEMENT SPEC                 ]
 ]_____________________________________________________________________]
 ] DESCRIPTION:                                                        ]
 ]                                                                     ]
 ] WHEN RESELECTING AN MTU ACCUMULATOR FOR A CS WHICH IS CURRENTLY     ]
 ] ON GPC TIME, THE DOWN ARROW IS BLANKED ONLY FOR THE SPECIFIC        ]
 ] ACCUMULATOR WHICH HAS BEEN SUCCESSFULLY SELECTED. THIS WILL BE      ]
 ] TRUE EVEN THOUGH ALL ACCUMULATOR TIMES ARE IDENTICAL AND HAVE       ]
 ] BEEN MADE AVAILABLE FOR THE MTU REDUNDANCY MANAGEMENT (RM)          ]
 ] SOURCE SELECTION LOGIC. THE DOWN ARROW INDICATORS REPRESENT         ]
 ] THE STATE OF A PARTICULAR MTU ACCUMULATOR FOR THE LAST PASS         ]
 ] THROUGH MTU RM FOR WHICH THAT ACCUMULATOR WAS ACTUALLY TESTED       ]
 ] AS A SOURCE BY THE SELECTION LOGIC.                                 ]
 ]                                                                     ]
 ]                                                                     ]
 ]                                                                     ]
 ]                                                                     ]
 ]                                                                     ]
 ]_____________________________________________________________________]
 ]USER RESPONSE:                                                       ]
 ]                                                                     ]
 ] THE USER SHOULD RECOGNIZE THE DISPLAY STATUS AS A RESULT OF THE     ]
 ] ABOVE SCENARIO AND EITHER IGNORE DOWN ARROWS ON ACCUMULATORS NOT    ]
 ] SELECTED OR MANUALLY RESET THEM.  DOWN ARROWS ON THE OTHER TWO MTU  ]
 ] ACCUMULATORS CAN BE REMOVED BY ITEM ENTRIES SELECTING EACH OF THE   ]
 ] OTHER ACCUMULATORS TO BE THE CURRENT SOURCE.                        ]
 ]                                                                     ]
 ]                                                                     ]
 ]                                                                     ]
 ]_____________________________________________________________________]
 ]CONCURRENCE:                           ]APPROVAL:                    ]
 ]IBM: PATTI A. THORNTON    DATE 09/14/90]                             ]
 ]    --------------------      ---------]                             ]
 ]FDSD:   SAM ANKNEY        DATE 09/14/90]                             ]
 ]     -------------------      ---------]DARRELL E. STAMPER  09/21/90 ]
 ]PF MGR:ELIZABETH FOUNTAIN DATE 09/17/90]------------------- -------- ]
 ]       ------------------     ---------] CHAIRMAN, SASCB      DATE   ]
 ]_______________________________________]_____________________________]
 @

