 +_____________________________________________________________________
 ] AUTHOR:            ]                             ] DR:              ]
 ]   Q. LARSON        ]    PASS PROGRAM NOTE        ]      107777      ]
 ]____________________]                             ]__________________]
 ] ORG/PHONE:         ] OPS NOTE (X)  USER NOTE ( ) ] DATE:            ]
 ] LSIS/(713)282-7251 ]      RELEASE NOTE( )        ]      07/08/94    ]
 ]____________________]_____________________________]__________________]
 ] OI/FLIGHT EFFECTIVITY:        ]  USER AFFECTED:                     ]
 ]   OI-24                       ]  CREW (X)  GROUND ( )  DUMP ONLY ( )]
 ]_______________________________]_____________________________________]
 ]        MAJOR SOFTWARE AREA:       ] OPS MODES AFFECTED:             ]
 ]SSW ( )  GNC (X)  VU ( )  SM/PL ( )] G2                              ]
 ]_____________________________________________________________________]
 ] SOFTWARE SUB-AREA:  ORBIT, FCS, DISP                                ]
 ]_____________________________________________________________________]
 ] PRINCIPAL FUNCTIONS:  4.35, 6.1                                     ]
 ]_____________________________________________________________________]
 ] TITLE:                                                              ]
 ]       DAPLOAD NUMBER NOT DISPLAYED                                  ]
 ]_____________________________________________________________________]
 ] DESCRIPTION:                                                        ]
 ]                                                                     ]
 ]    OI-24 SOFTWARE HAS A REQUIREMENT TO AUTOMATICALLY CHANGE THE     ]
 ]    DAP LOADS WITH ONE OF THE I-LOADED DAPS ON SPEC 20 AT THE        ]
 ]    TERMINATION OF THE POST CONTACT FIRING SEQUENCE (CR090837).      ]
 ]    NORMALLY THIS CHANGE CAN BE SEEN ON SPEC 20 NEXT TO ITEM 1 AND   ]
 ]    ITEM 2 FOR THE 'A' AND 'B' DAP RESPECTIVELY.  IF, HOWEVER, THE   ]
 ]    DAP LOAD IN ITEMS 1 OR 2 HAD BEEN MADE TO BLANK BY MODIFYING     ]
 ]    ONE OF THE DAP PARAMETERS, THE NEW DAP LOAD WILL ALSO BE BLANK   ]
 ]    AFTER THE TERMINATION OF THE POST CONTACT FIRING SEQUENCE EVEN   ]
 ]    THOUGH A NEW DAP LOAD HAS BEEN ENTERED FROM THE I-LOADS.  THIS   ]
 ]    IS A SPEC 20 DISPLAY PROBLEM ONLY.  THE ACTUAL DAP PARAMETERS    ]
 ]    ARE CORRECT AND THE DOWNLISTED DATA SHOWS THE NEW DAP LOAD       ]
 ]    CORRECTLY.                                                       ]
 ]                                                                     ]
 ]                                                                     ]
 ]_____________________________________________________________________]
 ]USER RESPONSE:                                                       ]
 ]                                                                     ]
 ]    RELOADING THE APPROPRIATE DAP LOAD(S) ON SPEC 20 AFTER           ]
 ]    TERMINATION OF THE POST CONTACT FIRING SEQUENCE WILL             ]
 ]    CAUSE THE NUMBER TO BE DISPLAYED PROPERLY.  ANOTHER              ]
 ]    POSSIBLE WORKAROUND IS TO ASSURE THAT A DAP ID NUMBER IS         ]
 ]    DISPLAYED ON SPEC 20 (I.E., DO NOT USE A MODIFIED DAP LOAD)      ]
 ]    BEFORE THE POST CONTACT FIRING SEQUENCE IS INITIATED.            ]
 ]                                                                     ]
 ]                                                                     ]
 ]_____________________________________________________________________]
 ]CONCURRENCE:                           ]APPROVAL:                    ]
 ]LSIS:  HUGH D. STOVALL    DATE 10/05/95]                             ]
 ]     -------------------      ---------]                             ]
 ]ASD:    W. R. PRUETT      DATE 10/05/94]                             ]
 ]     -------------------      ---------] DARRELL E. STAMPER 10/06/94 ]
 ]PF MGR:  K. L. LINDSAY    DATE 10/06/94]------------------- -------- ]
 ]       -----------------      ---------] CHAIRMAN, SASCB      DATE   ]
 ]_______________________________________]_____________________________]
 @