1+_____________________________________________________________________
  AUTHOR:                                          DR:              
  L.S. STOVALL          PASS REQUIREMENT WAIVER         105128      
 ____________________                             __________________
  ORG/PHONE:          WAIVER ONLY (X)              DATE:  12/06/91  
  IBM/282-8479        WAIVER/OPS NOTE ( )          REV A: 06/15/92  
 ___________________________________________________________________
  OI/FLIGHT EFFECTIVITY:          USER AFFECTED:                     
   OI-8F THRU OI-22               CREW ( )  GROUND (X)  DUMP ONLY ( )
 ____________________________________________________________________
         MAJOR SOFTWARE AREA:        OPS MODES AFFECTED:             
 SSW ( )  GNC (X)  VU ( )  SM/PL ( )  G1, G6, AND G3                 
 _____________________________________________________________________
  SOFTWARE SUB-AREA:  ILOAD                                           
 _____________________________________________________________________
  PRINCIPAL FUNCTIONS: 4.175, 4.176, 4.36, 4.227                      
 _____________________________________________________________________
  TITLE:                                                              
  INCORRECT UNITS ON SOME DERIVED EQUATIONS IN ILOAD MAPPING REPORT   
 _____________________________________________________________________
  REQUIREMENT TO BE WAIVED:                                           
    ANALYSTS USING THE ILOAD MAPPING REPORT SHOULD BE AWARE THAT      
    FOR THE FOLLOWING VARIABLES, DERIVED FROM ILOADS (NOT LOADED      
    DIRECTLY), THE UNITS DOCUMENTED ARE INCORRECT.  THERE IS NO       
    EFFECT ON FLIGHT PERFORMANCE, NOR IN APPLICATION OF ILOADS TO THE 
    FSW, NOR IN ANY OPERATIONAL PROCESS GENERATING SOFTWARE.          
                                                                      
   HAL VARIABLE                  INCORRECT UNITS    CORRECT UNITS     
    CGCS_KRATED_ZTRANS_OVR_TSTR   SEC**-1            SEC**-2          
    CGCV_KRATED                   SEC**-1            SEC**-2          
    CGCS_GDQ_INT_AUTO(1 TO 5)     DEG*SEC/DEG        SEC*LB**.5/FT    
    CGCS_GDQ_INT_CSS(1 TO 5)      DEG*SEC/DEG        SEC*LB**.5/FT    
    CGCS_GDQ_SLOPE_AUTO(1 TO 5)   DEG*SEC/DEG        SEC*LB**.5/FT    
    CGCS_GDQ_SLOPE_CSS(1 TO 5)    DEG*SEC/DEG        SEC*LB**.5/FT    
    CGCS_GRAY_INT(1 TO 5)         DEG*SEC/G          (DEG/SEC)/G      
    CGCS_GRAY_SLOPE(1 TO 5)       DEG*SEC/G          (DEG/SEC)/G      
    CGCS_KMINT_S1                 SEC**-1            SEC/SEC          
    CGCS_KMINT_S2                 SEC**-1            SEC/SEC          
    CGCS_KNINT_S1                 SEC**-1            SEC/SEC          
    CGCS_KNINT_S2                 SEC**-1            SEC/SEC          
    CGCV_HDSCLR_INC               COUNTS             DEG/COUNT        
    CGCS_SLOPE_KMMPS              SLUG**-1       (DEG/(DEG/SEC))/SLUG 
    CGCS_SLOPE_KNMPS              SLUG**-1       (DEG/(DEG/SEC))/SLUG 
 _____________________________________________________________________
 REQUIREMENTS DOC:                    PARAGRAPH AND/OR SECTION NO:   
    ILOAD MAPPING REPORT                                             
 ____________________________________________________________________
 ALTERNATE REQUIREMENT BEING MET, IF APPLICABLE:                      
 _____________________________________________________________________
 CONCURRENCE:                           APPROVAL:                    
 IBM:   JEAN L. ZOPHY      DATE 07/14/92                             
     --------------------      ---------                             
 FDSD:  ROBERT N. HINSON   DATE 07/20/92                             
      -------------------      --------- DARRELL E. STAMPER 07/30/92 
 PF MGR: KIRK A SHIREMAN   DATE 07/22/92---------------------------- 
        MARK M. HAMMERSCHMIDT   07/23/92 CHAIRMAN, SASCB      DATE   
 ____________________________________________________________________
 @
